The short version~2 min read

  • The most common earthmoving mistake is renting too much machine. An 8-ton excavator cannot get between two houses on a 40-foot lot; a 1.7-ton unit can, digs the same utility trench, and costs a third as much per day.
  • Every listing is a verified yard, with the machine photographed and the hour meter recorded.

Rates are sample ranges. The yard sets the price; we do not add a commission on top of it.

Yards with stock in Earthmoving yards

8 yards in and around Earthmoving yards hold the categories listed below. Filter by category, district or delivery to see who carries what.

8 yards
Yard list for Earthmoving yards demo inventory
YardDistanceDeliveryOn the lot
West side yard
Earthmoving yards · West side
28 miDelivery + pickupMini excavator 1.7 t · Mini excavator 3.5 t · Skid steer 66 in
Earthmoving
Request
Downtown fringe yard
Earthmoving yards · Downtown fringe
35 miPickup onlySkid steer 66 in · Telehandler 8,000 lb · Mini excavator 1.7 t
Earthmoving
Request
North corridor yard
Earthmoving yards · North corridor
26 miPickup onlyMini excavator 3.5 t · Skid steer 66 in · Telehandler 8,000 lb
Earthmoving
Request
Airport industrial yard
Earthmoving yards · Airport industrial
25 miDelivery + pickupTelehandler 8,000 lb · Mini excavator 1.7 t · Mini excavator 3.5 t
Earthmoving
Request
West side yard
Earthmoving yards · West side
8 miDelivery + pickupTelehandler 8,000 lb · Mini excavator 1.7 t · Mini excavator 3.5 t
Earthmoving
Request
Downtown fringe yard
Earthmoving yards · Downtown fringe
15 miPickup onlyMini excavator 3.5 t · Skid steer 66 in · Telehandler 8,000 lb
Earthmoving
Request
North corridor yard
Earthmoving yards · North corridor
22 miPickup onlySkid steer 66 in · Telehandler 8,000 lb · Mini excavator 1.7 t
Earthmoving
Request
Airport industrial yard
Earthmoving yards · Airport industrial
21 miDelivery + pickupMini excavator 1.7 t · Mini excavator 3.5 t · Skid steer 66 in
Earthmoving
Request

Rows are placeholder inventory for layout review. Every yard, distance and stock line is replaced by the live yard database before launch — no demo row is indexed as a business.

§1How to choose

The most common earthmoving mistake is renting too much machine. An 8-ton excavator cannot get between two houses on a 40-foot lot; a 1.7-ton unit can, digs the same utility trench, and costs a third as much per day.

The second mistake is forgetting the attachments. A skid steer with a bucket is a wheelbarrow; with a breaker, a grapple and a set of forks it replaces three machines. Attachments are usually cheaper to add at booking than to add on site.

§2Specs at a glance

Earthmoving specifications
SpecValue
Excavators1.0 / 1.7 / 3.5 / 5.5 / 8 ton
Skid steersTracked and wheeled, 1,500–2,700 lb ROC
TrenchersWalk-behind 18–36 in; ride-on 36–48 in
AttachmentsBreaker, auger, grapple, forks, bucket sizes
TransportTrailer rental or delivery; most units need a 10k trailer

§3What it is used for

  • Utility and irrigation trenching
  • Pool and foundation excavation
  • Grading and site prep
  • Demolition and loading
  • Landscape and drainage

§4Rates

Earthmoving — day and week rates sample ranges
ItemPer dayPer week
1.7-ton mini excavator$230 – $340$800 – $1,150
3.5-ton mini excavator$300 – $430$1,050 – $1,500
Skid steer, tracked$280 – $420$950 – $1,400
Walk-behind trencher$120 – $190$420 – $640

Delivery, fuel and damage waiver are quoted separately and shown before you confirm. A refundable deposit hold applies to every booking.

§5Rent by city

Same category, different local stock and delivery times:

§6Questions

Do I need a trailer?
Most 1.7-ton units tow on a 7,000 lb trailer with a half-ton truck; larger units need a 10–14k trailer or delivery.
Can a mini excavator dig through caliche?
With a breaker attachment or a rock bucket, slowly. Tell the yard what the ground is; bucket teeth are not interchangeable.
Is a spotter required?
On any site with pedestrians or traffic, yes. Most yards will not release a machine without confirming who is operating it.